GridPulse

ERCOT // 240V SPLIT-PHASE

Household Peak-Load Shift Optimizer, Sub-Panel Telemetry & 13.5 kWh LFP Island Simulator

Shave feeder peak demand before simple-cycle gas peakers & rolling load-shed relays trip.

Stagnant high-pressure heat dome pushes afternoon ambient temperatures to 104°F while thermal generation derates and evening AC load spikes across ERCOT.

Dieter Rams inspired GridPulse residential sub-panel load controller showing exposed copper bus bars, mechanical breaker toggles, and an LED strain arc gauge on limestone
FIG 01 // 240V SPLIT-PHASE COPPER BUS & SOLID-STATE PEAK-SHIFT RELAY MODULE CT CLAMP ACCURACY: +/-0.5%

Pre-cool thermal mass between 13:00 and 15:30, defer 40A EV charging to 01:00 wind surplus, and lock out resistive dryer drums during 16:00 - 20:00.

Peak Window Demand Reduction

0.0% shaved

-0.00 kW

19.65 kW baseline to 19.65 kW active

Time-of-Use Bill Arbitrage

$0.00

$0.00 / 30d

Marginal Peaker CO2 Avoided

0.00 kg

0.0 kg / 30d

Feeder Strain Index

91 / 100

CRITICAL: Critical Feeder Overload Risk (Baseline 91)

24-Hour Dual-Trace Demand Oscilloscope

Compares unshifted household peak profile (vermilion dashed) against active breaker and relay schedule (emerald solid).

Baseline Peak Curve Active Shifted Bus ERCOT Alert Window
Baseline 19.65 kW
Active Bus 19.65 kW
Interval Delta -0.00 kW
Interval Tariff $0.32/kWh

8-Circuit Sub-Panel Load Directory

Throw individual 240V / 120V breakers or arm automated time-of-use peak-shift relays to clear the ERCOT alert window.

8 Closed / 0 Shed / 0 Shifted